मेन्यू
मुफ़्त कला परामर्श

अवधि

  1. Ink drawing — पाब्लो पिकासो, 1931
  2. Ethnographic drawing - gunpowder holder — फर्नांडो बारबेडो गालहानो, 1900
  3. 2ND TOP FLOOR (Institute and lecture hall building Leipzig University Goethe-Straße, floor plan) — फ्रांज़ एर्लिच

विषय

कीवर्ड्स

मुख्य रंग

  1. A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan) — फ्रांज़ एर्लिच, 1976
  2. 4th TOP FLOOR (Floor plan of a building with 22 single rooms) — फ्रांज़ एर्लिच
  3. 3 WALLS IN THE HALL (Entrance, living room, study) — फ्रांज़ एर्लिच
  4. HKB II - NEW-BUILD 1RST TOP FLOOR (Ministry of the Interior, Berlin, plan view) — फ्रांज़ एर्लिच, 1950
  5. A.D.W. MAIN BUILDING 1RST TOP FLOOR 1RST WORKING DESIGN (Academy of Sciences) — फ्रांज़ एर्लिच, 1976
  6. A.D.W. MAIN BUILDING 1RST TOP FLOOR WORKING DESIGN 1 (Academy of Sciences) — फ्रांज़ एर्लिच, 1976
  7. A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan) — फ्रांज़ एर्लिच, 1976
  8. Ink Drawing of Han-shan, Shi-de and Feng-gan (Zen hermits)(Three Materials in One Set) — butsujo jisen
  9. LBH BUILDING MACHINERY WOODWORKING MACHINERY HALL 5 (Leipzig Trade Fair, plan view exhibition stand) — फ्रांज़ एर्लिच, 1949
  10. Drawing- 02 — Shubhankar Chandere
  11. Drawing- 03 — Shubhankar Chandere
  12. Table with section — Aldo Andreani
  13. Drawing: Construction of a painting studio, Liebermann Haus — johann otto friedrich julius grisebach, 1898
  14. Ink Drawing of Bodhidharma — eshin sōzu
  15. 2ND TOP FLOOR (Institute and lecture hall building Leipzig University Goethe-Straße, floor plan) — फ्रांज़ एर्लिच
  16. Ink drawing — पाब्लो पिकासो, 1931
  17. Untitled — ana hatherly de sousa, 1980
  18. Drawing for Bedroom Painting No. 15 — टॉम वेसेलमैन, 1968
  19. Ethnographic drawing - gunpowder holder — फर्नांडो बारबेडो गालहानो, 1900
  20. Preparatory drawing from In Memory of My Feelings — ग्रेस हार्टिगन, 1967
  21. Drawing: Construction of a terrasse, Liebermann Haus — johann otto friedrich julius grisebach, 1895
  22. Bauhaus Dessau preliminary course 1926/27. Wassily Kandinsky. Dividual (grid) and inividual (black) design of the square — friedrich konrad püschel, 1926
  23. South Elevation of Refreshment Wing — harry john johnson, 1874

अन्य

  1. The packaging I received together with a bottle of Bistra powder from the Rembrandt House - Museum. I did a little ink drawing on it — अल्फ्रेड फ़्रैडी क्रुपा, 2022